• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
A 10 MVA generator has reactance of 0.2 pu. Find the new reactance value for 50 MVA base?

 5 pu
 1 pu
 0.25 pu
 0.2 pu

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is

 6 MW
 12 MW
 5 MW
 10 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Non-commercial sources of energy are

  wood, animal wastes and agricultural wastes.
None of these
 fossil fuel, hydro power and nuclear power.
 solar, wind and biomass.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In an interconnected power system, the most suitable power plant to meet the peak load condition is

 pumped storage plant
 hydro power plant
 thermal plant
 nuclear plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Mho relay is used for the protection of

  long transmission lines.
 short length lines.
 medium length lines.
 no length criterion.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is

  Francis.
  Pelton.
  Kaplan.
  Impeller.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑