Power Systems Storage requirement can be determined from hydro-graph. flow duration curve. mass Curve. both B and C. hydro-graph. flow duration curve. mass Curve. both B and C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10-6∠90° â„§. Find the no load receiving end voltage? 500 kV 600 kV 400 kV 320 kv 500 kV 600 kV 400 kV 320 kv ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of the following relays has the capability of anticipating the possible major fault in a transformer? Differential relay Over fluxing relay Over current relay Buchholz relay Differential relay Over fluxing relay Over current relay Buchholz relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power system consists of 300 buses out of which 20 buses are generator buses, 25 buses are the ones with reactive power support buses and 15 buses are ones with fixed shunt capacitors. All the other buses are load buses. It is proposed to perform a load flow analysis for the system using Newton-Raphson Jacobian matrix is 555×555 553×553 554×554 540×540 555×555 553×553 554×554 540×540 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Cooling tower. Pulverising unit. Wind turbine. Condenser. Cooling tower. Pulverising unit. Wind turbine. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10^-6∠90° â„§. Find the shunt reactor required for compensating ferranti effect? 2000 Ω 500 Ω 3000 Ω 1500 Ω 2000 Ω 500 Ω 3000 Ω 1500 Ω ANSWER DOWNLOAD EXAMIANS APP