Power Systems Storage requirement can be determined from both B and C. mass Curve. flow duration curve. hydro-graph. both B and C. mass Curve. flow duration curve. hydro-graph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Uses of diesel power stations emergency plants. peak load plant. All of these standby plants. emergency plants. peak load plant. All of these standby plants. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of fuse wire is always expressed in ampere-hours. ampere-volts. amperes. kWh. ampere-hours. ampere-volts. amperes. kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Monograph. Load duration curve. Hydro-graph. Hectograph. Monograph. Load duration curve. Hydro-graph. Hectograph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station plant load factor is defined as the ratio of minimum load to peak load minimum load to average load average load to the peak load the energy generated to that of maximum energy that could have been generated minimum load to peak load minimum load to average load average load to the peak load the energy generated to that of maximum energy that could have been generated ANSWER DOWNLOAD EXAMIANS APP
Power Systems a 50 Hz, 3-phase synchronous generator has inductance per phase of 15 mH. The capacitance of the generator and circuit breaker is 0.002 µF. What is its natural frequency? 290 kHz 2.9 kHz 29 kHz 29 MHz 290 kHz 2.9 kHz 29 kHz 29 MHz ANSWER DOWNLOAD EXAMIANS APP