Irrigation Engineering The crest level of a canal diversion head work, depends upon F.S.L. of the canal All listed here Discharge perimeters Pond level F.S.L. of the canal All listed here Discharge perimeters Pond level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For the design of major hydraulic structures on the canals, the method generally preferred to, is based on The relaxation method Bligh's theory Electrical analogy method Khosla's method of independent variables The relaxation method Bligh's theory Electrical analogy method Khosla's method of independent variables ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A land is known as waterlogged capillary fringe reaches the root zone of plants None of these when gravity drainage has ceased when the permanent wilting point is reached capillary fringe reaches the root zone of plants None of these when gravity drainage has ceased when the permanent wilting point is reached ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Finally formed berms in canals are provided for Control of seepage losses Strengthening of banks Protection of banks erosion by the waves All of these Control of seepage losses Strengthening of banks Protection of banks erosion by the waves All of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering According to Kennedy, the critical velocity (V₀) in meters in a channel is the mean velocity which keeps the channel free from silting or scouring. Its value is given by (where m is critical velocity ratio and D is the depth of the channel). V₀ = 0.84 mD0.54 V₀ = 0.84 mD0.64 V₀ = 0.55 mD0.54 V₀ = 0.55 mD0.64 V₀ = 0.84 mD0.54 V₀ = 0.84 mD0.64 V₀ = 0.55 mD0.54 V₀ = 0.55 mD0.64 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering River training for depth is achieved by groynes groynes and bandalling both (A) and (B) construction of dykes or leavees groynes groynes and bandalling both (A) and (B) construction of dykes or leavees ANSWER DOWNLOAD EXAMIANS APP