Irrigation Engineering If the risk of a flood occurring in the next 10 years is accepted to 10%, then the return period for design should be 1/(1+ 0.9010) 1 + (0.9)010 1 – (0.9)°l0 1/(1-0.9°10) 1/(1+ 0.9010) 1 + (0.9)010 1 – (0.9)°l0 1/(1-0.9°10) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The uplift pressure on a dam can be controlled byi) constructing cutoff under upstream faceii) constructing drainage channels between the dam and its foundationiii) by pressure grouting in foundationThe corret answer is (i), (ii) and (iii) only (i) both (i) and (iii) both (i) and (ii) (i), (ii) and (iii) only (i) both (i) and (iii) both (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering F.S.L. of a canal at its head with respect to parent channel is kept 15 cm lower 15 cm higher None of these At the same level 15 cm lower 15 cm higher None of these At the same level ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Left side All listed here Right side Both sides Left side All listed here Right side Both sides ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The minimum size of stone that will remain at rest in a channel of longitudinal slope S and hydraulic mean depth R is given by 11RS 15 RS 4RS 7RS 11RS 15 RS 4RS 7RS ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When a canal and a drainage approach each other at the same level, the structure so provided, is An aqueduct A syphon A level crossing Inlet and outlet An aqueduct A syphon A level crossing Inlet and outlet ANSWER DOWNLOAD EXAMIANS APP