Irrigation Engineering The value of Sodium Absorption Ratio for high sodium water lies between 26 to 34 18 to 26 0 to 10 10 to 18 26 to 34 18 to 26 0 to 10 10 to 18 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The stream which does not have any base flow contribution is called None of these perennial stream intermittent stream ephemeral stream None of these perennial stream intermittent stream ephemeral stream ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The sinuosity of a meander is the ratio of None of these Meander length and the width of meander Meander length and half width of the river Curved length and the straight distance None of these Meander length and the width of meander Meander length and half width of the river Curved length and the straight distance ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The total capacity of a reservoir is 25 million cubic metres and dead storage is 5 million cubic metres. If the average volume of sediment deposition is 0.10 million cubic metre per year, then the usefulness of the reservoir will start reducing after 200 years 250 years 50 years 150 years 200 years 250 years 50 years 150 years ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.) 0.75 hw 1.50 hw 1.25 hw 0.5 hw 0.75 hw 1.50 hw 1.25 hw 0.5 hw ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A counter berm is A horizontal benching provided on the inside slope A vertical benching provided on the inner edge of the bank A horizontal benching provided on the outside slope A vertical benching provided on the outer edge of the bank A horizontal benching provided on the inside slope A vertical benching provided on the inner edge of the bank A horizontal benching provided on the outside slope A vertical benching provided on the outer edge of the bank ANSWER DOWNLOAD EXAMIANS APP