Irrigation Engineering
The rainfall on five successive days were measured as 100 mm, 80 mm, 60 mm, 40 mm and 20 mm respectively. If the infiltration index or the storm loss rate for the catchment area is earlier estimated as 50 mm/day, the total surface run off will be

90 mm
60 mm
140 mm
50 mm

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct sequence of the part of a canal system from the following

Heads works-branch canal-main canal distributary, minor
Head works-main canal-branch canal-minor-distributary
Head work-distributary-branch canal-minor
Head works-main canal-branch canal-distributary-minor

ANSWER DOWNLOAD EXAMIANS APP