Irrigation Engineering Horizontal acceleration due to earthquake results in both (A) and (B) None of these hydrodynamic pressure inertia force into the body of the dam both (A) and (B) None of these hydrodynamic pressure inertia force into the body of the dam ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be syphon aqueduct syphon aqueduct superpassage syphon aqueduct syphon aqueduct superpassage ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A land is known as waterlogged capillary fringe reaches the root zone of plants when the permanent wilting point is reached when gravity drainage has ceased None of these capillary fringe reaches the root zone of plants when the permanent wilting point is reached when gravity drainage has ceased None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.) 0.75 hw 1.25 hw 0.5 hw 1.50 hw 0.75 hw 1.25 hw 0.5 hw 1.50 hw ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The stream which does not have any base flow contribution is called perennial stream None of these intermittent stream ephemeral stream perennial stream None of these intermittent stream ephemeral stream ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The width of a meander belt is the transverse distance between Two banks of meandering river Apex point of one curve and apex point of the reserve curve None of these Apex point and the crossing Two banks of meandering river Apex point of one curve and apex point of the reserve curve None of these Apex point and the crossing ANSWER DOWNLOAD EXAMIANS APP