Irrigation Engineering Horizontal acceleration due to earthquake results in both (A) and (B) None of these inertia force into the body of the dam hydrodynamic pressure both (A) and (B) None of these inertia force into the body of the dam hydrodynamic pressure ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The duty is largest on the field at the head of water course at the head of a main canal same at all places on the field at the head of water course at the head of a main canal same at all places ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The uplift pressure on the face of a drainage gallery in a dam is taken as hydrostatic pressure at toe None of these two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel average of hydrostatic pressure at toe and heel hydrostatic pressure at toe None of these two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel average of hydrostatic pressure at toe and heel ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Lining of irrigation channels increases the waterlogging area None of these decreases the waterlogging area does not change the water logging area increases the waterlogging area None of these decreases the waterlogging area does not change the water logging area ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick Of height ⅓rd to ¼th the depth of water in the main canal All listed here Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick Of height ⅓rd to ¼th the depth of water in the main canal All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of the crest of a scouring sluice below the crest of a head regulator, is generally kept 0.20 m 1.20 m 3.20 m 2.20 m 0.20 m 1.20 m 3.20 m 2.20 m ANSWER DOWNLOAD EXAMIANS APP