Irrigation Engineering The "outlet discharge factor" is the duty at the head of distributory branch canal main canal watercourse distributory branch canal main canal watercourse ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering An outlet is said to be proportional if its flexibility, is More than one One Less than one Zero More than one One Less than one Zero ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The consumptive use of water for a crop All of these Is measured as depth of water on irrigated area May be supplied partly by precipitation and partly by irrigation Is measured as the volume of water per unit area All of these Is measured as depth of water on irrigated area May be supplied partly by precipitation and partly by irrigation Is measured as the volume of water per unit area ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be 1172 hectares/m3/sec 637 hectares/m3/sec 972 hectares/m3/sec 837 hectares/m3/sec 1172 hectares/m3/sec 637 hectares/m3/sec 972 hectares/m3/sec 837 hectares/m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For cereal crops the most commonly adopted method of irrigation, is Furrow method Free flowing method Sprinkling method Check method Furrow method Free flowing method Sprinkling method Check method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The uplift pressure on a dam can be controlled by i) constructing cutoff under upstream face ii) constructing drainage channels bet-ween the dam and its foundation iii) by pressure grouting in foundation The corret answer is both (i) and (iii) (i), (ii) and (iii) only (i) both (i) and (ii) both (i) and (iii) (i), (ii) and (iii) only (i) both (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP