Irrigation Engineering The "outlet discharge factor" is the duty at the head of watercourse main canal branch canal distributory watercourse main canal branch canal distributory ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the critical shear stress of a channel is XC, then the average value of shear stress required to move the grain on the bank is XC 0.75 TC 0.5 XC 1.33 TC XC 0.75 TC 0.5 XC 1.33 TC ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The length and width of a meander and also the width of the river, vary roughly as Square of the discharge Square root of the discharge Cube of the discharge Discharge Square of the discharge Square root of the discharge Cube of the discharge Discharge ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Delta stage of the river Boulders stage of the river Trough stage of the river Rock stage of the river Delta stage of the river Boulders stage of the river Trough stage of the river Rock stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The aqueduct or superpassage type of works are generally used when None of these high flood drainage discharge is large and continues for a long time high flood drainage discharge is small high flood drainage discharge is large and short lived None of these high flood drainage discharge is large and continues for a long time high flood drainage discharge is small high flood drainage discharge is large and short lived ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing, a cross regulator is provided on the canal below the crossing ANSWER DOWNLOAD EXAMIANS APP