Irrigation Engineering Silt excluders are constructed on the river bed downstream of head regulator canal bed downstream of head regulator canal bed upstream of head regulator river bed upstream of head regulator river bed downstream of head regulator canal bed downstream of head regulator canal bed upstream of head regulator river bed upstream of head regulator ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Optimum depth of kor watering for rice is 190 mm 165 mm 135 mm 215 mm 190 mm 165 mm 135 mm 215 mm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following canal outlets maintains a constant discharge ? rigid module non-modular outlet flexible outlet None of these rigid module non-modular outlet flexible outlet None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When the reservoir is full, the maximum compressive force in a gravity dam is produced within the middle third of base at centre of base at the heel at the toe within the middle third of base at centre of base at the heel at the toe ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When a canal flowing under pressure is carried below a natural drainage such that its F.S.L. doesnot touch the underside of the supporting structure, the structure so provided, is called Syphon Aqueduct Super passage Syphon-aqueduct Syphon Aqueduct Super passage Syphon-aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hydroelectric scheme operating under a head of 80 m will be classified as None of these medium head scheme low head scheme high head scheme None of these medium head scheme low head scheme high head scheme ANSWER DOWNLOAD EXAMIANS APP