Irrigation Engineering A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If<="" div=""> 4.5 cm 9.0 cm 7.5 cm 6.0 cm 4.5 cm 9.0 cm 7.5 cm 6.0 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In Montague type fall A parabolic glacis is provided A straight glacis is provided No glacis is provided A circular glacis is provided A parabolic glacis is provided A straight glacis is provided No glacis is provided A circular glacis is provided ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? area-velocity method slope-area method ultra-sonic method moving boat method area-velocity method slope-area method ultra-sonic method moving boat method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The structure constructed to allow drainage water to flow under pressure through an inverted syphon below a canal, is called Syphon Super passage Syphon aqueduct Super-aqueduct Syphon Super passage Syphon aqueduct Super-aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Cyclonic precipitation is caused by lifting of an air mass due to All of these temperature difference pressure difference natural topographical barriers All of these temperature difference pressure difference natural topographical barriers ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The downstream expansion head of a guide bank is extended to subtend an angle at the centre, equal to 30° 45° 90° 60° 30° 45° 90° 60° ANSWER DOWNLOAD EXAMIANS APP