Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 60 minutes 20 minutes 30 minutes 15 minutes 60 minutes 20 minutes 30 minutes 15 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In rigid module, the discharge Is independent of water levels in the distributary and water course Depends upon the water levels of both, i.e. distributary and water course Depends upon the water level in the water course Depends upon the water level in distributary Is independent of water levels in the distributary and water course Depends upon the water levels of both, i.e. distributary and water course Depends upon the water level in the water course Depends upon the water level in distributary ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For standing crops in undulating sandy fields, the best method of irrigation, is Sprinkler irrigation Furrow method Check method Free flooding Sprinkler irrigation Furrow method Check method Free flooding ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Garnett's diagrams are used for graphical solution of design equations of a canal by Kennedy's theory Lacey's theory Lindlay theory Gibb's theory Kennedy's theory Lacey's theory Lindlay theory Gibb's theory ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable material for the central impervious core of a zoned embankment type dam is clay silty clay coarse sand clay mixed with fine sand clay silty clay coarse sand clay mixed with fine sand ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal All of these In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal All of these In a level crossing a regulator is provided across the drainage at its down-stream ANSWER DOWNLOAD EXAMIANS APP