Irrigation Engineering As compared to gravity dams, earthen dams are costlier are less susceptible to failure require less skilled labour require sound rock foundations are costlier are less susceptible to failure require less skilled labour require sound rock foundations ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In Montague type fall A circular glacis is provided No glacis is provided A parabolic glacis is provided A straight glacis is provided A circular glacis is provided No glacis is provided A parabolic glacis is provided A straight glacis is provided ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The total capacity of a reservoir is 25 million cubic metres and dead storage is 5 million cubic metres. If the average volume of sediment deposition is 0.10 million cubic metre per year, then the usefulness of the reservoir will start reducing after 50 years 150 years 200 years 250 years 50 years 150 years 200 years 250 years ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.) 0.5 hw 1.50 hw 0.75 hw 1.25 hw 0.5 hw 1.50 hw 0.75 hw 1.25 hw ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Unit of runoff in M.K.S. system is cubic metre metre/sec square metre cubic metre/sec cubic metre metre/sec square metre cubic metre/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Coefficient of discharge of an ogee spillway depends on depth of approach and upstream slope remains constant both (A) and (B) depends on downstream apron interference and downstream submergence depends on depth of approach and upstream slope remains constant both (A) and (B) depends on downstream apron interference and downstream submergence ANSWER DOWNLOAD EXAMIANS APP