Irrigation Engineering
Pick up the correct statement from the following and answer

All of these
In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal
In a level crossing a regulator is provided across the drainage at its down-stream
In a level crossing, a cross regulator is provided on the canal below the crossing

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct sequence of the part of a canal system from the following

Heads works-branch canal-main canal distributary, minor
Head work-distributary-branch canal-minor
Head works-main canal-branch canal-distributary-minor
Head works-main canal-branch canal-minor-distributary

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct statement from the following sentence

The escapes are aligned to take advantage of contours of lower values
The escapes must lead the surplus water to natural drainages
Escapes are essential safety valves in a canal system
All of these

ANSWER DOWNLOAD EXAMIANS APP