Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing a regulator is provided across the drainage at its down-stream ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Lane's weighted creep theory assumes Double weightage to horizontal creep and one weightage to vertical creep Triple weightage to horizontal creep and one weightage to vertical creep Equal weightage to horizontal and vertical creeps Triple weightage to vertical creep and one weightage to horizontal creep Double weightage to horizontal creep and one weightage to vertical creep Triple weightage to horizontal creep and one weightage to vertical creep Equal weightage to horizontal and vertical creeps Triple weightage to vertical creep and one weightage to horizontal creep ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For cereal crops the most commonly adopted method of irrigation, is Free flowing method Sprinkling method Furrow method Check method Free flowing method Sprinkling method Furrow method Check method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Boulders stage of the river Trough stage of the river Rock stage of the river Delta stage of the river Boulders stage of the river Trough stage of the river Rock stage of the river Delta stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Process of meandering is due to Sediment load of streams All listed here Relative erodibility of the bed and banks Discharge and hydraulic properties of streams Sediment load of streams All listed here Relative erodibility of the bed and banks Discharge and hydraulic properties of streams ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Free board Height of bank Berm None of these Free board Height of bank Berm None of these ANSWER DOWNLOAD EXAMIANS APP