Irrigation Engineering Pick up the correct statement from the following and answer All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be 837 hectares/m3/sec 637 hectares/m3/sec 972 hectares/m3/sec 1172 hectares/m3/sec 837 hectares/m3/sec 637 hectares/m3/sec 972 hectares/m3/sec 1172 hectares/m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Effective precipitation for a crop may be defined as Total precipitation minus the loss due to infiltration Available water stored in soil within root zone of the crop Total precipitation minus the loss due to evaporation Total precipitation during the crop period Total precipitation minus the loss due to infiltration Available water stored in soil within root zone of the crop Total precipitation minus the loss due to evaporation Total precipitation during the crop period ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a divide wall is to prevent river floods from entering the canal separate the undersluices from weir proper control the silt entry in the canal provide smooth flow at sufficiently low velocity prevent river floods from entering the canal separate the undersluices from weir proper control the silt entry in the canal provide smooth flow at sufficiently low velocity ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A raingauge should preferably be fixed in a closed space in an open space near the building under the tree in a closed space in an open space near the building under the tree ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural drain ? canal outlet canal regulator canal escape canal fall canal outlet canal regulator canal escape canal fall ANSWER DOWNLOAD EXAMIANS APP