Building Construction The brick laid with its breadth parallel to the face of a wall, is known as Closer None of these Stretcher Header Closer None of these Stretcher Header ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 4 meters 1 meter 3 meters 2 meters 4 meters 1 meter 3 meters 2 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Crown and ground level Crown and springing line Intrados and extrados Ground level and springing line Crown and ground level Crown and springing line Intrados and extrados Ground level and springing line ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Column forms All the above at the same time Bottom of beams and girders Sides of beams and girders Column forms All the above at the same time Bottom of beams and girders Sides of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.5 du 1.35 du 1.25 du 1.75 du 1.5 du 1.35 du 1.25 du 1.75 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction Best type of piles for soft soil having little resistance to the flow of concrete, is Franki pile Vibro pile Simplex pile Raymond pile Franki pile Vibro pile Simplex pile Raymond pile ANSWER DOWNLOAD EXAMIANS APP