Building Construction

Building Construction
The brick laid with its breadth parallel to the face of a wall, is known as

Closer
None of these
Stretcher
Header

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For each storey (or, story) of a building, the depth of exploration should be

4 meters
1 meter
3 meters
2 meters

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The depth of an arch is the distance between

Crown and ground level
Crown and springing line
Intrados and extrados
Ground level and springing line

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of multi-storeyed buildings, the forms to be removed first are

Column forms
All the above at the same time
Bottom of beams and girders
Sides of beams and girders

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is

1.5 du
1.35 du
1.25 du
1.75 du

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Best type of piles for soft soil having little resistance to the flow of concrete, is

Franki pile
Vibro pile
Simplex pile
Raymond pile

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑