Building Construction The brick laid with its breadth parallel to the face of a wall, is known as Header None of these Closer Stretcher Header None of these Closer Stretcher ANSWER DOWNLOAD EXAMIANS APP
Building Construction Raft foundation are generally preferred to when the area required for individual footing, is more than 30% of total area 50% of total area 40% to total area 25% to total area 30% of total area 50% of total area 40% to total area 25% to total area ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for beams and slabs; is 25 to 50 mm 30 to 125 mm 25 to 75 mm 50 to 100 mm 25 to 50 mm 30 to 125 mm 25 to 75 mm 50 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Eccentric piles Construction piles Sinking piles Raking piles Eccentric piles Construction piles Sinking piles Raking piles ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 40 mm 20 mm 30 mm 10 mm 40 mm 20 mm 30 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 3, 2, 5, 1, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 2, 1, 3, 5, 4 3, 2, 5, 1, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP