DGVCL Exam Paper (11-12-2011) The best location of the power factor correction equipment to be installed in the transmission line is at The receiving end Middle of the line The sending end Any place The receiving end Middle of the line The sending end Any place ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The circuit breaker generally used in railway traction is Bulk Oil CB Air break CB Vacuum CB Minimum Oil CB Bulk Oil CB Air break CB Vacuum CB Minimum Oil CB ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) A fuse wire should have Low specific resistance and high melting point Low specific resistance and low melting point High specific resistance and low melting point High specific resistance and high melting point Low specific resistance and high melting point Low specific resistance and low melting point High specific resistance and low melting point High specific resistance and high melting point ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If a relay fails to operate inspite of a fault in its own zone of protection, it is said to Reach Over reach Pick up Under reach Reach Over reach Pick up Under reach ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If the excitation of a synchronous generator fails, it acts as a Synchronous motor Induction motor Synchronous generator Induction generator Synchronous motor Induction motor Synchronous generator Induction generator ANSWER EXPLANATION DOWNLOAD EXAMIANS APP if excitation of synchronous generator fails, operate as induction motor
DGVCL Exam Paper (11-12-2011) Which of the following power distribution system gives better reliabity ? Radial system DC 3 wire system Ring main system None of these Radial system DC 3 wire system Ring main system None of these ANSWER DOWNLOAD EXAMIANS APP