DGVCL Exam Paper (11-12-2011) The best location of the power factor correction equipment to be installed in the transmission line is at Any place The sending end Middle of the line The receiving end Any place The sending end Middle of the line The receiving end ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Which motor is used to start heavy loads? Cumulatively compounded motor Differentially compounded motor Shunt motor Series motor Cumulatively compounded motor Differentially compounded motor Shunt motor Series motor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Torque in d.c motor = k* φ * IaIn series motor φ α IaTα I²starting torque of dc series motor is high
DGVCL Exam Paper (11-12-2011) The circuit breaker generally used in railway traction is Bulk Oil CB Minimum Oil CB Air break CB Vacuum CB Bulk Oil CB Minimum Oil CB Air break CB Vacuum CB ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The mutual inductance between two unity coupled coils of 9 H and 4 H is 6 H 36 H 2.2 H 13 H 6 H 36 H 2.2 H 13 H ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Which of the following power distribution system gives better reliabity ? Radial system DC 3 wire system None of these Ring main system Radial system DC 3 wire system None of these Ring main system ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) A Mho relay is a Directional restrained over current relay Voltage controlled over current relay Directional restrained over voltage relay Voltage restrained directional relay Directional restrained over current relay Voltage controlled over current relay Directional restrained over voltage relay Voltage restrained directional relay ANSWER DOWNLOAD EXAMIANS APP