DGVCL Exam Paper (11-12-2011) The best location of the power factor correction equipment to be installed in the transmission line is at Any place Middle of the line The receiving end The sending end Any place Middle of the line The receiving end The sending end ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The transient stability of a power system can be improved by Phase shifting transformer Excitation control Increasing the turbine valve opening Single pole switching of circuit breakers Phase shifting transformer Excitation control Increasing the turbine valve opening Single pole switching of circuit breakers ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) A fixed step by step procedure for finding the solution of a problem on computer is called Logic Hardware Algorithm Software Logic Hardware Algorithm Software ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) An AC series circuit has R = 6 Ω, XL = 20 Ω and Xc = 12 Ω. The ciruit power factor will be 0.5 leading 0.6 lagging 0.8 lagging 0.6 leading 0.5 leading 0.6 lagging 0.8 lagging 0.6 leading ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) If the voltage at the two ends of a line are 132 kV, and its reactance is 40 Ω, the stability limit of the line is 435.6 MW 251.5 MW 217.8 MW 500 MW 435.6 MW 251.5 MW 217.8 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Rated making capacity of a ciruit breaker is equal to 2.55 X rated symmetrical breaking capacity √2 X rated symmetrical breaking capacity Rated symmetrical breaking capacity 1.11 X rated symmetrical breaking capacity 2.55 X rated symmetrical breaking capacity √2 X rated symmetrical breaking capacity Rated symmetrical breaking capacity 1.11 X rated symmetrical breaking capacity ANSWER DOWNLOAD EXAMIANS APP