Railway Engineering Dog spikes are used for fixing rail to the wooden sleepers concrete sleepers steel trough sleepers CST-9 sleepers wooden sleepers concrete sleepers steel trough sleepers CST-9 sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 10.21m 6.10 m 8.84 m 10.82 m 10.21m 6.10 m 8.84 m 10.82 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The shape of transition curve used by Indian Railways is cubic parabola spiral sine curve lemniscate of Bernoulli cubic parabola spiral sine curve lemniscate of Bernoulli ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If ‘A’ is the angle formed by two gauge faces, the crossing number will be sec A tan A cot A Arad sec A tan A cot A Arad ANSWER DOWNLOAD EXAMIANS APP