Industrial Engineering and Production Management Queuing theory deals with problems of Reducing the waiting time or idle time Effective use of machines Better utilization of man services Material handling Reducing the waiting time or idle time Effective use of machines Better utilization of man services Material handling ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A dummy activity Is represented by a dotted line All of the these Does not require any time Is artificially introduced Is represented by a dotted line All of the these Does not require any time Is artificially introduced ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Job enrichment technique is applied to All of the listed here Make people happy Reduce labour monotony Overcome boring and demotivating work All of the listed here Make people happy Reduce labour monotony Overcome boring and demotivating work ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The start or completion of task is called None of these An event A duration An activity None of these An event A duration An activity ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is known as Duration Interfering float Total float Free float Duration Interfering float Total float Free float ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The factors which are to be considered while developing a good wage incentive plan will include All of the listed here Ease of administration Guaranteed basic pay Adequate incentive All of the listed here Ease of administration Guaranteed basic pay Adequate incentive ANSWER DOWNLOAD EXAMIANS APP