Industrial Engineering and Production Management According to Rowan plan of wage incentive system, bonus is paid to a worker On the percentage of time worked On the percentage of time saved Whose output exceeds 67% efficiency On the percentage of standard time On the percentage of time worked On the percentage of time saved Whose output exceeds 67% efficiency On the percentage of standard time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Discrepancies of bar chart techniques are Consequential effects of lack in one activity on the finish date Effective monitoring/controlling can't be done All of these Free time available for an activity can't be predicted Consequential effects of lack in one activity on the finish date Effective monitoring/controlling can't be done All of these Free time available for an activity can't be predicted ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Choose the wrong statement Time study is used to Determine overhead expenses Determine the capability of an operator to handle the number of machines Determine standard costs Provide a basis for setting piece prices or incentive wages Determine overhead expenses Determine the capability of an operator to handle the number of machines Determine standard costs Provide a basis for setting piece prices or incentive wages ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management CPM has following time estimate One time estimate Two time estimate Four time estimate Three time estimate One time estimate Two time estimate Four time estimate Three time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In manufacturing management, the term 'Dispatching' is used to describe Dispatch of finished product of the user Dispatch of sales order Dispatch of factory mail Dispatch of work orders through shop floor Dispatch of finished product of the user Dispatch of sales order Dispatch of factory mail Dispatch of work orders through shop floor ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is negative It represents a situation where extra resources are available and the completion of project is not delayed It represents that a programme falls behind schedule and additional resources are required to complete the project in time All of these The activity is critical and any delay in its performance will delay the completion of whole project It represents a situation where extra resources are available and the completion of project is not delayed It represents that a programme falls behind schedule and additional resources are required to complete the project in time All of these The activity is critical and any delay in its performance will delay the completion of whole project ANSWER DOWNLOAD EXAMIANS APP