Industrial Engineering and Production Management Positive slack on a PERT indicates that project is On critical path Beyond schedule As per schedule Ahead of schedule On critical path Beyond schedule As per schedule Ahead of schedule ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The type of organisation preferred for an automobile industry, is Functional organisation Line and staff organisation Line, staff and functional organisation Line organisation Functional organisation Line and staff organisation Line, staff and functional organisation Line organisation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If TL is the largest allowable event occurrence time, total activity slack (s) is equal to Latest finish time earliest finish time (EFT) TLEFT All of these Latest start time earliest start time Latest finish time earliest finish time (EFT) TLEFT All of these Latest start time earliest start time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it Consumes neither time nor resources Consumes time, but no resources Is a dangling event Consumes resources but no time Consumes neither time nor resources Consumes time, but no resources Is a dangling event Consumes resources but no time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The two bin system is concerned with Ordering procedure Production planning Forecasting sales Despatching and expediting Ordering procedure Production planning Forecasting sales Despatching and expediting ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A graphical device used to determine the break-even point and profit potential under varying conditions of output and costs, is known as Gantt chart Flow chart Break-even chart PERT chart Gantt chart Flow chart Break-even chart PERT chart ANSWER DOWNLOAD EXAMIANS APP