Industrial Engineering and Production Management Line organization is suitable for Sugar industries Oil refining industries Spinning and weaving industries All of these Sugar industries Oil refining industries Spinning and weaving industries All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management What does symbol 'D' imply in work study? Inspection Permanent storage Delay/temporary storage Transport Inspection Permanent storage Delay/temporary storage Transport ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work sampling is applied for Estimating the percentage of the time consumed by various job activities All of these Finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible Estimation of the percentage utilization of machine tools Estimating the percentage of the time consumed by various job activities All of these Finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible Estimation of the percentage utilization of machine tools ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following statement is correct about the network diagram? The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. The tail end of the arrow represents the start of an activity. The head of the arrow represents the end of an activity. All of the these The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. The tail end of the arrow represents the start of an activity. The head of the arrow represents the end of an activity. All of the these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The important file in making a PERT is No activity from any event can be started from preceding event till it is completed An event can't be accomplished until activities leading to it are completed Length of arrow has nothing to do with time All of the these No activity from any event can be started from preceding event till it is completed An event can't be accomplished until activities leading to it are completed Length of arrow has nothing to do with time All of the these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management CPM has following time estimate Two time estimate Four time estimate Three time estimate One time estimate Two time estimate Four time estimate Three time estimate One time estimate ANSWER DOWNLOAD EXAMIANS APP