Industrial Engineering and Production Management Process layout is also known as Static product layout Synthetic layout None of these Analytical-layout Static product layout Synthetic layout None of these Analytical-layout ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM < DAM CAM > DAM There is no such criterion CAM = DAM CAM < DAM CAM > DAM There is no such criterion CAM = DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Break-even analysis consists of Fixed and variable costs Variable cost Fixed cost Operation costs Fixed and variable costs Variable cost Fixed cost Operation costs ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.84 0.5 0.95 0.66 0.84 0.5 0.95 0.66 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In time study, the rating factor is applied to determine Normal time of a worker Fixation of incentive rate Merit rating of the worker Standard time of a job Normal time of a worker Fixation of incentive rate Merit rating of the worker Standard time of a job ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Templates are used for A planning layout Advancing a programme in automatic machines Flow of material Copying complicated profiles A planning layout Advancing a programme in automatic machines Flow of material Copying complicated profiles ANSWER DOWNLOAD EXAMIANS APP