Industrial Engineering and Production Management Pick up the correct step used for scheduling a project by C.P.M. Required time for each activity is established Sequence of various activities is made according to their importance A project is divided into various activities All of these Required time for each activity is established Sequence of various activities is made according to their importance A project is divided into various activities All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In a PERT chart Only critical activities are numbered Only selected activities are numbered All activities should be numbered Only important activities should be numbered Only critical activities are numbered Only selected activities are numbered All activities should be numbered Only important activities should be numbered ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In time study, the rating factor is applied to determine Normal time of a worker Merit rating of the worker Fixation of incentive rate Standard time of a job Normal time of a worker Merit rating of the worker Fixation of incentive rate Standard time of a job ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time as compared to normal time is There is no such correlation Smaller Equal Greater There is no such correlation Smaller Equal Greater ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Break-even analysis can be used for Average of above two run analysis Long run analysis There is no such criterion Short run analysis Average of above two run analysis Long run analysis There is no such criterion Short run analysis ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Product layout is employed for Continuous production Effective utilization of machine All of these Batch production Continuous production Effective utilization of machine All of these Batch production ANSWER DOWNLOAD EXAMIANS APP