Industrial Engineering and Production Management Which of the following wage incentive plan is applied to all workers? Gantt plan Halsey plan Emerson's efficiency plan Rowan plan Gantt plan Halsey plan Emerson's efficiency plan Rowan plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having Minimum slack No slack Maximum slack Average slack Minimum slack No slack Maximum slack Average slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Queueing theory is used for Job-shop scheduling All of these Inventory problems Traffic congestion studies Job-shop scheduling All of these Inventory problems Traffic congestion studies ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good LS = LFD EF = ES + D LF = LS + D All of these LS = LFD EF = ES + D LF = LS + D All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path moves along the activities having total float of Zero value Positive value Same value Negative value Zero value Positive value Same value Negative value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In product layout Manufacturing cost rises with a fall in the volume of production All of these Machines can not be used to their maximum capacity Specialized and strict supervision is required Manufacturing cost rises with a fall in the volume of production All of these Machines can not be used to their maximum capacity Specialized and strict supervision is required ANSWER DOWNLOAD EXAMIANS APP