Power Systems What are the tests performed for oil-filled and gas-filled cables ? All of these. Impulse tests. Load cycle tests. Thermal stability test. All of these. Impulse tests. Load cycle tests. Thermal stability test. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? None of these. Direct laying. Draw - in - system / duct - pipe laying. Both A and B. None of these. Direct laying. Draw - in - system / duct - pipe laying. Both A and B. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 core cable gives on test a capacitance of 3.7 µF between two cores. Find the line charging current of the cable when it is connected to 11 kV, 50 Hz system? 14.7 mA. 14.76 A. 1 A. 1.476 A. 14.7 mA. 14.76 A. 1 A. 1.476 A. ANSWER DOWNLOAD EXAMIANS APP
Power Systems String efficiency depends upon no. of SCR in the string. voltage rating of whole string. voltage rating of one SCR. all of these. no. of SCR in the string. voltage rating of whole string. voltage rating of one SCR. all of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal protection switch is used to provide protection against short circuit. over voltage. overload. temperature. short circuit. over voltage. overload. temperature. ANSWER DOWNLOAD EXAMIANS APP