Power Systems A 3 core cable gives on test a capacitance of 3.7 µF between two cores. Find the line charging current of the cable when it is connected to 11 kV, 50 Hz system? 1 A. 1.476 A. 14.76 A. 14.7 mA. 1 A. 1.476 A. 14.76 A. 14.7 mA. ANSWER DOWNLOAD EXAMIANS APP
Power Systems India’s largest thermal power station is located at Neyveli. Sarni. Chandrapur. Kota. Neyveli. Sarni. Chandrapur. Kota. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Equal area criterion gives the information regarding absolute stability swing curves relative stability stability region absolute stability swing curves relative stability stability region ANSWER DOWNLOAD EXAMIANS APP
Power Systems The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is 250 kW 750 kW 500 kW 300 kW 250 kW 750 kW 500 kW 300 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Units of incremental cost is Rs/hr Rs/MWhr RsMW/hr MWhr/Rs Rs/hr Rs/MWhr RsMW/hr MWhr/Rs ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ground capacitance existing between transmission line and ground is 4µF. Find the inductive reactance of the peterson coil for compensation of arcing grounds? 855.26 Ω 0.844 Ω 625.35 Ω 265.25 Ω 855.26 Ω 0.844 Ω 625.35 Ω 265.25 Ω ANSWER DOWNLOAD EXAMIANS APP