Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Hydro Power Plant Gas-turbine. Thermal. Nuclear. Hydro Power Plant Gas-turbine. Thermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Transmission lines are transposed to reduce ferranti effect interference with neighbouring communication lines proximity effect skin effect ferranti effect interference with neighbouring communication lines proximity effect skin effect ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.5 1 0.6 0.75 0.5 1 0.6 0.75 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power plants the size of coal after crushing 300 mm. 40 mm. 200 - 205 mm. 20 - 25 mm. 300 mm. 40 mm. 200 - 205 mm. 20 - 25 mm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The inductance of single phase two wire line is given by 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(d/r') H/m 4×10-7× ln(r'/d) H/m 0.4×10-7× ln(d/r') H/m 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(d/r') H/m 4×10-7× ln(r'/d) H/m 0.4×10-7× ln(d/r') H/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 56 %. 14 %. None of above 28 %. 56 %. 14 %. None of above 28 %. ANSWER DOWNLOAD EXAMIANS APP