Power Systems Out of the following plant categories which is not the base load power plant? Nuclear. Run of river. Diesel. Pump storage. Nuclear. Run of river. Diesel. Pump storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Vacuum CB. Air blast CB. Oil CB. SF6 CB. Vacuum CB. Air blast CB. Oil CB. SF6 CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems To prevent maloperation of deferentially connected relay while energizing a transformer, the relay restraining coil is biased with 3rd harmonic current. 2nd harmonic current. 7th harmonic current. 5th harmonic current. 3rd harmonic current. 2nd harmonic current. 7th harmonic current. 5th harmonic current. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulation of modern EHV is designed based on RI. lightning voltage. switching voltage. corona. RI. lightning voltage. switching voltage. corona. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 2.0 kV / μs. 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. ANSWER DOWNLOAD EXAMIANS APP