Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? SF6 CB. Vacuum CB. Air blast CB. Oil CB. SF6 CB. Vacuum CB. Air blast CB. Oil CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Transmission line parameters of the short transmission line are 1,Z,0,1 1,Z,Y,1 1,0,Y,1 Z,0,Y,1 1,Z,0,1 1,Z,Y,1 1,0,Y,1 Z,0,Y,1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The flow duration curve at a given head of a hydroelectric plant is used to determine load factory at the plant. diversity factor for the plant. total units of energy available. total power available at the site. load factory at the plant. diversity factor for the plant. total units of energy available. total power available at the site. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LL LG LLG LLL LL LG LLG LLL ANSWER DOWNLOAD EXAMIANS APP
Power Systems The charging current of a 400 kV line is more than that of a 220 kV line of the same length? either 1 or 2 True None of these False either 1 or 2 True None of these False ANSWER DOWNLOAD EXAMIANS APP
Power Systems What will be the thermal efficiency of a 240 V, 1000 W electric kettle if it brings 2 liters of water at 15° C to boiling point 15 Minutes 80.25 %. 78.96 %. 74.56 %. 79.33 %. 80.25 %. 78.96 %. 74.56 %. 79.33 %. ANSWER DOWNLOAD EXAMIANS APP