Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Oil CB. Vacuum CB. SF6 CB. Air blast CB. Oil CB. Vacuum CB. SF6 CB. Air blast CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.44. 1.3. 0.25. 0.83. 0.44. 1.3. 0.25. 0.83. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draw back of NR method as compare to Gauss-Seidel method is/are? large requirement of computer memory large number of iterations both 1 and 2 None of these large requirement of computer memory large number of iterations both 1 and 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 150, 150 100, 200 175, 125 200, 100 150, 150 100, 200 175, 125 200, 100 ANSWER DOWNLOAD EXAMIANS APP
Power Systems To prevent maloperation of deferentially connected relay while energizing a transformer, the relay restraining coil is biased with 2nd harmonic current. 5th harmonic current. 7th harmonic current. 3rd harmonic current. 2nd harmonic current. 5th harmonic current. 7th harmonic current. 3rd harmonic current. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault current is 2000 A, the relay setting is 50% and CT ratio is 400 : 5, then plug setting multiplier will be 10. 25. 15. 50. 10. 25. 15. 50. ANSWER DOWNLOAD EXAMIANS APP