Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Vacuum CB. Oil CB. Air blast CB. SF6 CB. Vacuum CB. Oil CB. Air blast CB. SF6 CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Gauss Seidel load flow method has following disadvantages. Which of the following statement is wrong? Choice of slack bus affects the convergence Slow convergence Unreliable convergence A good initial guess for voltages is essential for convergence Choice of slack bus affects the convergence Slow convergence Unreliable convergence A good initial guess for voltages is essential for convergence ANSWER DOWNLOAD EXAMIANS APP
Power Systems The neutral of 10 MVA, 11 kV alternator is earthed through a resistance of 5 ohms. The fault ready is set to operate at 0.75 A. The current transformers have a ratio of 1000/5. What is the percentage of the alternator winding is protected? 11.8% 88.2% 15% 85% 11.8% 88.2% 15% 85% ANSWER DOWNLOAD EXAMIANS APP
Power Systems Telecommunication lines are transposed to reduce the All of these voltage level efficiency radio interference in communication lines All of these voltage level efficiency radio interference in communication lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of high energy loss in boiler. low steam turbine mechanical efficiency. high energy loss from turbine exhaust to condenser. low alternative efficiency. high energy loss in boiler. low steam turbine mechanical efficiency. high energy loss from turbine exhaust to condenser. low alternative efficiency. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not base load power plant Nuclear. Diesel. Run water. Pump storage. Nuclear. Diesel. Run water. Pump storage. ANSWER DOWNLOAD EXAMIANS APP