Power Systems Stability of a transmission line can be increased by shunt capacitor series capacitor both 1 and 2 shunt reactor shunt capacitor series capacitor both 1 and 2 shunt reactor ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j1 pu j6 pu j3 pu j9 pu j1 pu j6 pu j3 pu j9 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Minimum load station. Base load station. None of above. Peak load station. Minimum load station. Base load station. None of above. Peak load station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station? 72 MW 30 MW 720 MW 50 MW 72 MW 30 MW 720 MW 50 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.83. 0.44. 0.25. 1.3. 0.83. 0.44. 0.25. 1.3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mechanical energy is supplied to a DC generator at the rate of 4200 J / S. The generator delivers 32.2 Amp at 120 V. How much energy is cost per minute of operation 20060 J. 25060 J. 20160 J. 23060 J. 20060 J. 25060 J. 20160 J. 23060 J. ANSWER DOWNLOAD EXAMIANS APP