Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3 × 106 kV / sec. 3.5 × 106 kV / sec. 2 × 106 kV / sec. 1 × 106 kV / sec. 3 × 106 kV / sec. 3.5 × 106 kV / sec. 2 × 106 kV / sec. 1 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A CT is connected in ___________________ with the line. across. series. both A and B. not connected. across. series. both A and B. not connected. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In relay coil which is used? Power transformer. Instrument transformer. Current transformer. Potential transformer. Power transformer. Instrument transformer. Current transformer. Potential transformer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The pickup value of relay is 6.5 Amp and fault current in relay coil is 39 Amp. Its plug setting multiplier is 10 A. 8 A. 6 A. 7 A. 10 A. 8 A. 6 A. 7 A. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Buchholz relay is used for protection of none of these. alternator. transformer. bus bar. none of these. alternator. transformer. bus bar. ANSWER DOWNLOAD EXAMIANS APP