Railway Engineering Number of keys used in CST-9 sleeper is 2 None of these 3 4 2 None of these 3 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements I and 2 are correct 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct I and 2 are correct 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of cotters used in CST-9 sleepers is 5 3 4 2 5 3 4 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 7.5 m 8.5m 5.5m 6.5 m 7.5 m 8.5m 5.5m 6.5 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle depends oni) heel divergenceii) length of tongue railiii) flangeway clearanceiv) throw of switch The correct answer is (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP