MGVCL Exam Paper (30-07-2021 Shift 3)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 20 Ω and the resistance of the resistor connected to the sound core was 40 Ω. Calculate the distance of the fault point from the test end.

200 m
300 m
400 m
100 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
In two-part tariff, the ____ charges depend upon the maximum demand of the consumer and the ____ charges depend upon the number of units consumed by the consumer.

fixed, semi-fixed
running, fixed
fixed, running
semi-fixed, running

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
What is the full form of the acronym 'SWIFT', in financial institution?

Society for Worldwide Interbank Financial Telecommunication
Society website in Financial Terms
Social World interconnection in Financial Tech process
Social Wide in Financial Transaction

ANSWER DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
The DC offset in fault current causes conventional over-current (OC) relays to :

reach remains unaffected due to DC offset
over-reach
sometimes under-reach and sometimes over-reach
under-reach

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP