Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 20 Ω and the resistance of the resistor connected to the sound core was 40 Ω. Calculate the distance of the fault point from the test end.

200 m
100 m
300 m
400 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
Consider a solar PV plant with the following specific conditions:
Analysis period: 1 year
Measured average solar irradiation intensity in 1 year: 150 kWh/m²
Generator area of the PV plant: 10 m² Efficiency factor of the PV modules: 15%
Electrical energy actually exported by plant to grid: 135 kWh
Calculate the performance ratio.

80%
50%
75%
60%

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
What is the full form of the acronym 'SWIFT', in financial institution?

Social World interconnection in Financial Tech process
Social Wide in Financial Transaction
Society website in Financial Terms
Society for Worldwide Interbank Financial Telecommunication

ANSWER DOWNLOAD EXAMIANS APP