MGVCL Exam Paper (30-07-2021 Shift 3)
Fill in the blanks with suitable Preposition from the given alternatives. BCCI receives____1000 applications for Team India head coach position
For the cut-in speed is the point at which the wind turbine is able to generate power. Between the cut-in speed and the rated speed, where the maximum output is reached, the power output will increase cubically with wind speed. Pmax directly propotional to cubical of wind speed. So, by double the speed of wind power will be increased by 8 times.
Bus Type - Known Parameter - Unknown Parameter Load Bus -P, Q - V, phase angle Generator Bus - P, V (magnitude) - Q, Voltage phase angle Slack Bus Voltage - magnitude and phase angle - P, Q
Due to the ever-increasing demand and growth in popularity of such advances as electric vehicles, there are several challenges power grid operators need to face. 1.Growing amount of renewable energy sources 2. Frequent power outages. 3. Increase in Energy Demand 4. Global rise in temperature 5. Grid modernization. 6. Electricity transmission losses.