MGVCL Exam Paper (30-07-2021 Shift 3)
Fill in the blanks with suitable Preposition from the given alternatives. BCCI receives____1000 applications for Team India head coach position
The capacity factor is the ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period. Nuclear power plants are at the high end of the range of capacity factors