Process Equipment and Plant Design Maximum size of the raschig rings used in a packed tower is about __________ of the coloumn diameter. 1/10th 1/50th 1/30th 1/20th 1/10th 1/50th 1/30th 1/20th ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement pertaining to the design of a long tube vertical evaporator. Tube dia is 3-6 cms, while tube length in 3-6 metres None of these Steam is fed to the shell, whereas the liquor is filled inside the tube Liquor level is maintained at l/3rd to 1/2 of the height of the tube Tube dia is 3-6 cms, while tube length in 3-6 metres None of these Steam is fed to the shell, whereas the liquor is filled inside the tube Liquor level is maintained at l/3rd to 1/2 of the height of the tube ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In case of a 'thin' pressure vessel, the ratio of its diameter to wall thickness is < 10 > 10 > 20 30 < 10 > 10 > 20 30 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger, the 'tube pitch' is defined as the O.D. of the tube for square pitch Shortest centre to centre distance between adjacent tubes Shortest distance between two adj acent tube holes None of these O.D. of the tube for square pitch Shortest centre to centre distance between adjacent tubes Shortest distance between two adj acent tube holes None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Corrosion allowance in the design of pressure vessel/chemical equipment is not necessary, if Wall thickness is > 30 mm Material of construction is high alloy steel Plain carbon steel and cast iron parts are used Both B & C Wall thickness is > 30 mm Material of construction is high alloy steel Plain carbon steel and cast iron parts are used Both B & C ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Weep holes provided in the plates of a distillation column All of these Must be large enough (usually 1/4" to 5/8" dia) to prevent plugging but should not deliver excessive amount of fluid during operation Are normally located near the overflow weir so that any delivery of liquid during operation follows approximately the same path as the overflow fluid Facilitate draining out liquid from a tray when the unit is not in operation All of these Must be large enough (usually 1/4" to 5/8" dia) to prevent plugging but should not deliver excessive amount of fluid during operation Are normally located near the overflow weir so that any delivery of liquid during operation follows approximately the same path as the overflow fluid Facilitate draining out liquid from a tray when the unit is not in operation ANSWER DOWNLOAD EXAMIANS APP