Process Equipment and Plant Design Maximum size of the raschig rings used in a packed tower is about __________ of the coloumn diameter. 1/10th 1/30th 1/50th 1/20th 1/10th 1/30th 1/50th 1/20th ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Bubble cap plate column is A differential stage contactor A finite stage contactor A continuous contactor Used only for distillation, not for absorption A differential stage contactor A finite stage contactor A continuous contactor Used only for distillation, not for absorption ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Ratio of tube length to shell diameter for a shell and tube heat exchanger is < 4 : 1 for gas-gas exchangers 4 : 1 to 8 : 1 for liquid-liquid exchanger 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers Both B & C < 4 : 1 for gas-gas exchangers 4 : 1 to 8 : 1 for liquid-liquid exchanger 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers Both B & C ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger, triangular pitch arrangement as compared to square pitch arrangement Facilitates easier shell side cleaning; hence is more suitable for handling high dirt factor shell side fluid Can accomodate less number of tubes for a given shell diameter Creates relatively lower turbulence on the shell side resulting in lower shell side heat transfer co-efficient Results in higher shell side pressure drop Facilitates easier shell side cleaning; hence is more suitable for handling high dirt factor shell side fluid Can accomodate less number of tubes for a given shell diameter Creates relatively lower turbulence on the shell side resulting in lower shell side heat transfer co-efficient Results in higher shell side pressure drop ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Cooling water fouling factors vary in the range of 0.001 to 0.003 (BTU/hr.ft² . °F)⁻¹ (W/m².°K)⁻¹ (kcal/hr.m² .°C)⁻¹ (kcal/hr. m. °C)⁻¹ (BTU/hr.ft² . °F)⁻¹ (W/m².°K)⁻¹ (kcal/hr.m² .°C)⁻¹ (kcal/hr. m. °C)⁻¹ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement about routing of fluids in a shell and tube heat exchanger. The corrosive and fouling fluid should be preferably routed through the tubes Higher pressure fluid stream should be routed through the shell side Lower flow rate fluid should be routed through the shell side The viscous fluid should be routed through the shell side The corrosive and fouling fluid should be preferably routed through the tubes Higher pressure fluid stream should be routed through the shell side Lower flow rate fluid should be routed through the shell side The viscous fluid should be routed through the shell side ANSWER DOWNLOAD EXAMIANS APP