Process Equipment and Plant Design Fresh water carrying pipelines in chemical industries are coloured with __________ color. Sea green Yellow Red Brown Sea green Yellow Red Brown ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Le/D for fully open gate valves would be Much less (say 2% than that for fully open globe valves) Much more than that for fully open globe valves Both B and C Around 7 Much less (say 2% than that for fully open globe valves) Much more than that for fully open globe valves Both B and C Around 7 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The ratio of shear stress to shear strain is called Modulus of rigidity Modulus of elasticity Shear modulus Bulk modulus Modulus of rigidity Modulus of elasticity Shear modulus Bulk modulus ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following lengths of heat exchanger tubes are normally not used in practice? 0.5 metre 2.5 metres 6 metres 10 metres 0.5 metre 2.5 metres 6 metres 10 metres ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Shortest distance between two tubes is Called tube clearance None of these More in case of triangular pitch as compared to square pitch of tube layout Called tube pitch Called tube clearance None of these More in case of triangular pitch as compared to square pitch of tube layout Called tube pitch ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a rotary drier, the average retention time of solid is(where Z = length of the drier, metres ρ = apparent solid density, kg/m³ L = flow rate of dry solids, kg/see. m² drier cross-section H = hold up of solid.) Z.H.ρ/L L/Z.H.ρ H.ρ/L Z.H/L.ρ Z.H.ρ/L L/Z.H.ρ H.ρ/L Z.H/L.ρ ANSWER DOWNLOAD EXAMIANS APP