Industrial Engineering and Production Management Abbreviated work factor data is applied for All of these Packing and shipping operation Material handling operation Maintenance operation All of these Packing and shipping operation Material handling operation Maintenance operation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The allowed time for a job equals standard time plus Process allowance Policy allowance Interference allowance Learning allowance Process allowance Policy allowance Interference allowance Learning allowance ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The type of layout used for manufacturing steam turbines, is Product layout Fixed position layout Process layout Any one of these Product layout Fixed position layout Process layout Any one of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.84 0.66 0.5 0.95 0.84 0.66 0.5 0.95 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The type of organisation preferred for a steel industry, is Line organisation Line and staff organisation Functional organisation Line, staff and functional organisation Line organisation Line and staff organisation Functional organisation Line, staff and functional organisation ANSWER DOWNLOAD EXAMIANS APP