Industrial Engineering and Production Management Abbreviated work factor data is applied for All of these Packing and shipping operation Material handling operation Maintenance operation All of these Packing and shipping operation Material handling operation Maintenance operation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In perpetual inventory control, the material is checked as it reaches its Middle value Minimum value Maximum value Average value Middle value Minimum value Maximum value Average value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The start or completion of task is called An activity A duration An event None of these An activity A duration An event None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Slack represents the difference between the Normal allowable time and the latest expected time Latest allowable time and the earliest expected time Proposed allowable time and the earliest expected time Latest allowable time and the normal expected time Normal allowable time and the latest expected time Latest allowable time and the earliest expected time Proposed allowable time and the earliest expected time Latest allowable time and the normal expected time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Queuing theory deals with problems of Better utilization of man services Effective use of machines Reducing the waiting time or idle time Material handling Better utilization of man services Effective use of machines Reducing the waiting time or idle time Material handling ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The important file in making a PERT is Length of arrow has nothing to do with time No activity from any event can be started from preceding event till it is completed An event can't be accomplished until activities leading to it are completed All of the these Length of arrow has nothing to do with time No activity from any event can be started from preceding event till it is completed An event can't be accomplished until activities leading to it are completed All of the these ANSWER DOWNLOAD EXAMIANS APP