Industrial Engineering and Production Management The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as Job enlargement Job evaluation Job enrichment Job rotation Job enlargement Job evaluation Job enrichment Job rotation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used when Idle time is to be reduced All of these Team of workers is working at a place Material handling is to be done Idle time is to be reduced All of these Team of workers is working at a place Material handling is to be done ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT requires Triple time estimate None of the listed here Double time estimate Single time estimate Triple time estimate None of the listed here Double time estimate Single time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is negative All of these It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed The activity is critical and any delay in its performance will delay the completion of whole project All of these It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed The activity is critical and any delay in its performance will delay the completion of whole project ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In product layout Machines can not be used to their maximum capacity Specialized and strict supervision is required Manufacturing cost rises with a fall in the volume of production All of these Machines can not be used to their maximum capacity Specialized and strict supervision is required Manufacturing cost rises with a fall in the volume of production All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PMTP (predetermined motion time systems) include BNTS (basic motion time study) WFS (work factor systems) All of these MTM (method time measurement) BNTS (basic motion time study) WFS (work factor systems) All of these MTM (method time measurement) ANSWER DOWNLOAD EXAMIANS APP