Industrial Engineering and Production Management The type of organisation preferred for a steel industry, is Line organisation Line and staff organisation Functional organisation Line, staff and functional organisation Line organisation Line and staff organisation Functional organisation Line, staff and functional organisation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The most suitable incentive plan for the maintenance section of an industry will be Group incentive plan Profit sharing plans Piece rate system Simplification Group incentive plan Profit sharing plans Piece rate system Simplification ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following are the principles of material handling? Select only efficient handling equipment Move the heaviest weight to the least distance Keep all the handling to the minimum All of these Select only efficient handling equipment Move the heaviest weight to the least distance Keep all the handling to the minimum All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study is most useful Where production activities are involved In judging the output of a man and improving it In judging the rating of machines In improving industrial relations Where production activities are involved In judging the output of a man and improving it In judging the rating of machines In improving industrial relations ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the correct step used for scheduling a project by C.P.M. Required time for each activity is established Sequence of various activities is made according to their importance All of these A project is divided into various activities Required time for each activity is established Sequence of various activities is made according to their importance All of these A project is divided into various activities ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be 2 HA 1.33 HA 1.15 HA 1.5 HA 2 HA 1.33 HA 1.15 HA 1.5 HA ANSWER DOWNLOAD EXAMIANS APP