Scheduling

Prescribes the sequence of operations to be followed
Determines the programme for the operations
Is concerned with starting of processes
Regulates the progress of job through various processes

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
The assumption in PERT is

A project will always be behind schedule, if left uncorrected
A project can be subdivided into a set of predictable, independent activities
Cost of project will always be more than the estimated cost, if no timely corrections are taken
Activities are fixed and can't be changed

ANSWER DOWNLOAD EXAMIANS APP