Industrial Engineering and Production Management P.M.T.S. (Predetermined Motion Time Systems) include All of these M.T.S. (Basic Motion Time Study) M.T.M. (Method Time Measurement) W.F.S. (Work Factor Systems) All of these M.T.S. (Basic Motion Time Study) M.T.M. (Method Time Measurement) W.F.S. (Work Factor Systems) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is Cost of project will always be more than the estimated cost, if no timely corrections are taken Activities are fixed and can't be changed A project will always be behind schedule, if left uncorrected A project can be subdivided into a set of predictable, independent activities Cost of project will always be more than the estimated cost, if no timely corrections are taken Activities are fixed and can't be changed A project will always be behind schedule, if left uncorrected A project can be subdivided into a set of predictable, independent activities ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In CPM, the cost slope is determined by Normal Cost/Crash cost Crash cost/Normal Cost (Normal cost - Crash cost)/ (Normal time - Crash time) (Crash Cost - Normal cost)/ (Normal time - Crash time) Normal Cost/Crash cost Crash cost/Normal Cost (Normal cost - Crash cost)/ (Normal time - Crash time) (Crash Cost - Normal cost)/ (Normal time - Crash time) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when(Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM < DAM CAM > DAM There is no such criterion CAM = DAM CAM < DAM CAM > DAM There is no such criterion CAM = DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standing orders which are statutory are applicable to All process industries and thermal power plants Only major industries All industries employing more than 100 workers All industries All process industries and thermal power plants Only major industries All industries employing more than 100 workers All industries ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to Rowan plan of wage incentive system, bonus is paid to a worker On the percentage of time saved On the percentage of standard time On the percentage of time worked Whose output exceeds 67% efficiency On the percentage of time saved On the percentage of standard time On the percentage of time worked Whose output exceeds 67% efficiency ANSWER DOWNLOAD EXAMIANS APP