MGVCL Exam Paper (30-07-2021 Shift 2)
In the following question, one part of the sentence may have an error. Find out which part of the sentence has an error and select the option corresponding to it. If the sentence contains no error, Select "No error'' option. (Avoid punctuation errors). (A) The Manager, with / (B) all his employee, was / (C) fired from the company /(D) NO ERROR
The capacity of reactor = 50 MVAr when it is operated at 415 kV. Impedance of reactor = V2/MVAr = (415*415)2/50 = 3444.5 Ω For 400 kV, Reactive power observed = (400*400)/3444.5 = 46.45 MVAR
Or
VAr capacity of capacitor or reactor is proportional to V²
India ranked 4^th in the Global Wind Power Installed Capacity index with cumulative installed wind power generation capacity of 25088. Wind power generation capacity in India has significantly increased in recent years. As of 28 February 2021, the total installed wind power capacity was 38.789 GW, the fourth largest installed wind power capacity in the world.