MGVCL Exam Paper (30-07-2021 Shift 2)
In the following question, one part of the sentence may have an error. Find out which part of the sentence has an error and select the option corresponding to it. If the sentence contains no error, Select "No error'' option. (Avoid punctuation errors).
(A) The Manager, with / (B) all his employee, was / (C) fired from the company /(D) NO ERROR

MGVCL Exam Paper (30-07-2021 Shift 2)
Which one of the following statement with respect to Aerial Bunched Cables (ABC) system is TRUE?

ABC system requires more clearance, insulators and high maintenance.
ABC system totally eliminates the fault on lines and thereby improving the quality of supply.
The overall cost of the ABC system is very high as compared to the bare conductor system.
ABC system is not suitable for rural electrification which are situated in difficult terrain, hills, forests and coastal areas.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
A single phase motor connected to 415 V, 50 Hz supply takes 30 A at a power factor of 0.7 lagging. Calculate the capacitance required in parallel with the motor to raise the power factor to 0.9 lagging.

66.32 µF
86.32 µF
76.32 µF
96.32 µF

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP