MGVCL Exam Paper (30-07-2021 Shift 2)
In the following question, one part of the sentence may have an error. Find out which part of the sentence has an error and select the option corresponding to it. If the sentence contains no error, Select "No error'' option. (Avoid punctuation errors).
(A) The Manager, with / (B) all his employee, was / (C) fired from the company /(D) NO ERROR

MGVCL Exam Paper (30-07-2021 Shift 2)
The magnitude of the generator earth-fault current is limited by

using higher rating CTs
inserting the stabilizing resistance in series with the relay
controlling field exciter
inserting suitable resistance in neutral grounding circuit

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
The necessary equation to be solved during the load flow analysis using Fast-Decoupled method is given below:
where B' and B'' are formed using the imaginary part of the bus admittance matrix, Ybus. If the system consists of 6 buses of which one of the bus is slack bus and 2 bues are voltage regulated buses, then then the matrix B' is of order ____and the matrix B'' is of order____, respectivity.
∆P/|Vi| = - B'∆δ
∆Q/|Vi| = - B''∆|V|

5 and 3
3 and 5
6 and 3
3 and 6

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
____are long-term (hours-long) voltage sags caused by system overload.

Black outs
Voltage surges
Voltage dips
Brownouts

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP