MGVCL Exam Paper (30-07-2021 Shift 2)
According to Global Wind Energy Council in 2016, India ranked____ in the Global Wind Power Installed Capacity Index with cumulative installed wind power generation.

First
Third
Second
Fourth

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In a test by Murray loop for ground fault on 600 m of cable having a resistance of 1.5 Ω/km, the faulty cable is looped with a sound cable of the same length and area of cross section. If the ratio of the other two arms of the testing network at balance is 3 : 1, find the distance of the fault from the testing end of cables.

200 m
100 m
400 m
300 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Which one of the following statement with respect to Aerial Bunched Cables (ABC) system is TRUE?

The overall cost of the ABC system is very high as compared to the bare conductor system.
ABC system is not suitable for rural electrification which are situated in difficult terrain, hills, forests and coastal areas.
ABC system requires more clearance, insulators and high maintenance.
ABC system totally eliminates the fault on lines and thereby improving the quality of supply.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In the context of smart meters, the term 'SMETS' stand for

Smart Metering Equipment Technical Specifications
Standard Metering Equipment Technical Specifications
Smart Monitoring Equipment Technical Specifications
Standard Monitoring Equipment Technical Specifications

ANSWER DOWNLOAD EXAMIANS APP