Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Ground level Plinth level Midway ground level and water-table level Water table level Ground level Plinth level Midway ground level and water-table level Water table level ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 1 meter 2 meters 4 meters 3 meters 1 meter 2 meters 4 meters 3 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Dormer window Louvered window Lantern window Rash window Dormer window Louvered window Lantern window Rash window ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 15 mm 25 mm 45 mm 35 mm 15 mm 25 mm 45 mm 35 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 65 to 100 mm 25 to 40 mm 40 to 65 mm 25 mm 65 to 100 mm 25 to 40 mm 40 to 65 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical faces of a door opening which support frame of the door, are Jambs Reveals Styles Posts Jambs Reveals Styles Posts ANSWER DOWNLOAD EXAMIANS APP