Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Plinth level Water table level Midway ground level and water-table level Ground level Plinth level Water table level Midway ground level and water-table level Ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of concrete bed of the foundation depends upon The upward soil pressure The projection of the concrete block beyond the footing over it The mix of the concrete All listed here The upward soil pressure The projection of the concrete block beyond the footing over it The mix of the concrete All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction Vertical construction joints are provided where the shearing forces are minimum in the case of Girders Slabs Beams All of these Girders Slabs Beams All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soft clay of low bearing capacity, the type of steel pile generally used, is H-pile Disc pile Screw pile Pipe pile H-pile Disc pile Screw pile Pipe pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Blistering Hacking Peeling Dubbing Blistering Hacking Peeling Dubbing ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A flap valve at the bottom of tube is provided to extract the soil sample ANSWER DOWNLOAD EXAMIANS APP