Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Midway ground level and water-table level Ground level Water table level Plinth level Midway ground level and water-table level Ground level Water table level Plinth level ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of Single Flemish bond English bond Header bond Stretcher bond Single Flemish bond English bond Header bond Stretcher bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Levelling staff Ranging rod Boning rod Steel tape Levelling staff Ranging rod Boning rod Steel tape ANSWER DOWNLOAD EXAMIANS APP
Building Construction To obtain good bonding in brick masonry All of these Bats are used where necessary First class bricks are used Vertical joints in alternate courses are kept in plumb line All of these Bats are used where necessary First class bricks are used Vertical joints in alternate courses are kept in plumb line ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Cleat Batten Strut Purlin Cleat Batten Strut Purlin ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 mm 25 to 40 mm 65 to 100 mm 40 to 65 mm 25 mm 25 to 40 mm 65 to 100 mm 40 to 65 mm ANSWER DOWNLOAD EXAMIANS APP