Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Plinth level Midway ground level and water-table level Water table level Ground level Plinth level Midway ground level and water-table level Water table level Ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the None of these Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados Perpendicular distance between springing line and extrados None of these Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados Perpendicular distance between springing line and extrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its breadth parallel to the face of a wall, is known as Header Closer Stretcher None of these Header Closer Stretcher None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 420 350 450 500 420 350 450 500 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as English cross bond Dutch bond Rat-trap bond Monk bond English cross bond Dutch bond Rat-trap bond Monk bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction To construct a 10 cm thick partition wall, you will prefer Header bond Flemish bond Stretcher bond English bond Header bond Flemish bond Stretcher bond English bond ANSWER DOWNLOAD EXAMIANS APP