Waste Water Engineering
In case of Imhoff tanks,

Detention period is 2 hours
All of these
The velocity of flow is restricted to 0.30 m/minute
The shape is rectangular

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The sewers

Must be of adequate size to avoid over flow
All listed here
Must be laid at least 2 to 3 m deep to collect /water from the basements
Must flow under gravity ½ to ¾ full

ANSWER DOWNLOAD EXAMIANS APP