Waste Water Engineering In case of Imhoff tanks, Detention period is 2 hours The velocity of flow is restricted to 0.30 m/minute The shape is rectangular All of these Detention period is 2 hours The velocity of flow is restricted to 0.30 m/minute The shape is rectangular All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Irrigation Oxidation Purification Dilution Irrigation Oxidation Purification Dilution ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of a sewer is 150 mm, the gradient required for generating self cleansing velocity, is 1 in 100 1 in 60 1 in 120 None of these 1 in 100 1 in 60 1 in 120 None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of minimum hourly flow to the average flow of sewage is 43894 43833 43832 43834 43894 43833 43832 43834 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A rainfall may be classified as acidic if its pH value is less or equal to 6.5 5 6 7 6.5 5 6 7 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 1 minute 3 minutes 2 minutes 5 minutes 1 minute 3 minutes 2 minutes 5 minutes ANSWER DOWNLOAD EXAMIANS APP