Process Equipment and Plant Design In a distillation column, minimum clearance to be maintained betweeen the overflow weir and the last row of the bubble caps is __________ cms. 7.5 15 20 2.5 7.5 15 20 2.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Smaller sized packings are generally dumped to the packed columns, and the large ones of size greater than __________ mm are stacked individually, which provides better control over bed porosity and offers lower gas pressure drop. 75 150 25 50 75 150 25 50 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In seive plate column, holes are drilled or punched in sizes ranging from 2.5 to 12 mm (5 mm being widely used). The hole pitch is normally __________ times the hole diameter to give the required hole area. 0.5 to 1.5 5 to 10 10 to 15 2.5 to 4.0 0.5 to 1.5 5 to 10 10 to 15 2.5 to 4.0 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design An increase in the liquid resistance to interphase mass transfer and a resultant reduction in plate efficiency is caused by All of these An increase in liquid viscosity Decrease in gas solubility for absorbers An increase in relatived volatility for rectification columns All of these An increase in liquid viscosity Decrease in gas solubility for absorbers An increase in relatived volatility for rectification columns ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Joint efficiency (J) for a seamless pipe is 1 0.85 1.2 < 0.5 1 0.85 1.2 < 0.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The shell side pressure drop in a shell and tube heat exchanger is maximum for __________ baffle. Orifice Disk and ring Independent of the type of Segmental Orifice Disk and ring Independent of the type of Segmental ANSWER DOWNLOAD EXAMIANS APP