If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be

More than 50 %
0.5
Less than 50 %
1

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
At a work site, statistical quality control of concrete means

Applying the theory' of probability to sample testing or inspection
Reduction in wastage of inspection costs
Measurement of risks to eliminate failures
Reduction in costs for the removal of defects

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
Free float is mainly used to

Identify the activities, which can be delayed without affecting the total float of succeeding activity
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
Establish priorities
Identify the activities which can be delayed without affecting the total float of preceding activity