GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Base load Peak load solar power plant none of these Base load Peak load solar power plant none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Synchronization problems Noise, pollution and maintenance problems Low life span Very high development costs Synchronization problems Noise, pollution and maintenance problems Low life span Very high development costs ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Can't say Quit high almost equal Quit low Can't say Quit high almost equal Quit low ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents base load of the system energy generated in the period considered average load of the system Maximum demand of the power station base load of the system energy generated in the period considered average load of the system Maximum demand of the power station ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? angle of the voltage is not considered AVR loop response is slower than LFC loop deference of error is the main reason Change in voltage magnitude marginally affects real power angle of the voltage is not considered AVR loop response is slower than LFC loop deference of error is the main reason Change in voltage magnitude marginally affects real power ANSWER DOWNLOAD EXAMIANS APP