GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant Base load none of these Peak load solar power plant Base load none of these Peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Low life span Synchronization problems Very high development costs Noise, pollution and maintenance problems Low life span Synchronization problems Very high development costs Noise, pollution and maintenance problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Quit high Quit low almost equal Can't say Quit high Quit low almost equal Can't say ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents average load of the system Maximum demand of the power station base load of the system energy generated in the period considered average load of the system Maximum demand of the power station base load of the system energy generated in the period considered ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power deference of error is the main reason AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power deference of error is the main reason ANSWER DOWNLOAD EXAMIANS APP