GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? none of these Peak load solar power plant Base load none of these Peak load solar power plant Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Synchronization problems Noise, pollution and maintenance problems Low life span Very high development costs Synchronization problems Noise, pollution and maintenance problems Low life span Very high development costs ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Quit high almost equal Quit low Can't say Quit high almost equal Quit low Can't say ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents average load of the system Maximum demand of the power station base load of the system energy generated in the period considered average load of the system Maximum demand of the power station base load of the system energy generated in the period considered ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? angle of the voltage is not considered Change in voltage magnitude marginally affects real power deference of error is the main reason AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power deference of error is the main reason AVR loop response is slower than LFC loop ANSWER DOWNLOAD EXAMIANS APP