GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Peak load none of these solar power plant Base load Peak load none of these solar power plant Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Synchronization problems Very high development costs Low life span Noise, pollution and maintenance problems Synchronization problems Very high development costs Low life span Noise, pollution and maintenance problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is almost equal Quit high Quit low Can't say almost equal Quit high Quit low Can't say ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents base load of the system average load of the system Maximum demand of the power station energy generated in the period considered base load of the system average load of the system Maximum demand of the power station energy generated in the period considered ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? AVR loop response is slower than LFC loop deference of error is the main reason Change in voltage magnitude marginally affects real power angle of the voltage is not considered AVR loop response is slower than LFC loop deference of error is the main reason Change in voltage magnitude marginally affects real power angle of the voltage is not considered ANSWER DOWNLOAD EXAMIANS APP