GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Peak load Base load solar power plant none of these Peak load Base load solar power plant none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Low life span Very high development costs Noise, pollution and maintenance problems Synchronization problems Low life span Very high development costs Noise, pollution and maintenance problems Synchronization problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Quit high Quit low Can't say almost equal Quit high Quit low Can't say almost equal ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents base load of the system average load of the system energy generated in the period considered Maximum demand of the power station base load of the system average load of the system energy generated in the period considered Maximum demand of the power station ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power deference of error is the main reason AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power deference of error is the main reason ANSWER DOWNLOAD EXAMIANS APP