GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? none of these solar power plant Peak load Base load none of these solar power plant Peak load Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Noise, pollution and maintenance problems Synchronization problems Low life span Very high development costs Noise, pollution and maintenance problems Synchronization problems Low life span Very high development costs ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Can't say Quit low almost equal Quit high Can't say Quit low almost equal Quit high ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents energy generated in the period considered base load of the system Maximum demand of the power station average load of the system energy generated in the period considered base load of the system Maximum demand of the power station average load of the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? deference of error is the main reason AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power angle of the voltage is not considered deference of error is the main reason AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power angle of the voltage is not considered ANSWER DOWNLOAD EXAMIANS APP