GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant none of these Base load Peak load solar power plant none of these Base load Peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Synchronization problems Noise, pollution and maintenance problems Very high development costs Low life span Synchronization problems Noise, pollution and maintenance problems Very high development costs Low life span ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Can't say Quit low Quit high almost equal Can't say Quit low Quit high almost equal ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents Maximum demand of the power station base load of the system average load of the system energy generated in the period considered Maximum demand of the power station base load of the system average load of the system energy generated in the period considered ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? Change in voltage magnitude marginally affects real power angle of the voltage is not considered AVR loop response is slower than LFC loop deference of error is the main reason Change in voltage magnitude marginally affects real power angle of the voltage is not considered AVR loop response is slower than LFC loop deference of error is the main reason ANSWER DOWNLOAD EXAMIANS APP