GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Peak load none of these Base load solar power plant Peak load none of these Base load solar power plant ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Very high development costs Low life span Noise, pollution and maintenance problems Synchronization problems Very high development costs Low life span Noise, pollution and maintenance problems Synchronization problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is almost equal Quit high Quit low Can't say almost equal Quit high Quit low Can't say ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents average load of the system energy generated in the period considered base load of the system Maximum demand of the power station average load of the system energy generated in the period considered base load of the system Maximum demand of the power station ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? angle of the voltage is not considered Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop deference of error is the main reason angle of the voltage is not considered Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop deference of error is the main reason ANSWER DOWNLOAD EXAMIANS APP