GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant none of these Base load Peak load solar power plant none of these Base load Peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Very high development costs Low life span Synchronization problems Noise, pollution and maintenance problems Very high development costs Low life span Synchronization problems Noise, pollution and maintenance problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is almost equal Quit high Can't say Quit low almost equal Quit high Can't say Quit low ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents energy generated in the period considered average load of the system base load of the system Maximum demand of the power station energy generated in the period considered average load of the system base load of the system Maximum demand of the power station ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? Change in voltage magnitude marginally affects real power deference of error is the main reason angle of the voltage is not considered AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power deference of error is the main reason angle of the voltage is not considered AVR loop response is slower than LFC loop ANSWER DOWNLOAD EXAMIANS APP