Power Systems For flat voltage profile system, voltage regulation is 0% any of the above 100% 50% 0% any of the above 100% 50% ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Hydro Power Plant Nuclear. Thermal. Gas turbine. Hydro Power Plant Nuclear. Thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What will be the thermal efficiency of a 240 V, 1000 W electric kettle if it brings 2 liters of water at 15° C to boiling point 15 Minutes 78.96 %. 79.33 %. 80.25 %. 74.56 %. 78.96 %. 79.33 %. 80.25 %. 74.56 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 200 km operating at frequency of 10 Hz Hz. Find the type of the line short transmission line medium transmission line long transmission line any of the above short transmission line medium transmission line long transmission line any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems The steam power plant efficiency can be improved by decreasing the load on the plant. using large quantity of water. using high temperature and high pressure steam. burning large amount of coal. decreasing the load on the plant. using large quantity of water. using high temperature and high pressure steam. burning large amount of coal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Condition for maximum voltage regulation tanφ = R/X cosφ = X/R cosφ = R/X tanφ = X/R tanφ = R/X cosφ = X/R cosφ = R/X tanφ = X/R ANSWER DOWNLOAD EXAMIANS APP