Power Systems For flat voltage profile system, voltage regulation is 0% 50% 100% any of the above 0% 50% 100% any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Hydro electric power plant. Thermal power plant. Nuclear power plant. Gas turbine plant. Hydro electric power plant. Thermal power plant. Nuclear power plant. Gas turbine plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On what factors does the selection of a water turbine depend Speed. All of above. Nature of load. Working head. Speed. All of above. Nature of load. Working head. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs shunt resistance at receiving end All of these shunt reactor at receiving end shunt capacitor at receiving end shunt resistance at receiving end All of these shunt reactor at receiving end shunt capacitor at receiving end ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power capacity of a transmission line can be increased by increasing voltage level decreasing reactance value either 1 or 2 nether 1 nor 2 increasing voltage level decreasing reactance value either 1 or 2 nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In transmission lines distribution constants are inductance and resistance both 1 and 2 resistance inductance and capacitance inductance and resistance both 1 and 2 resistance inductance and capacitance ANSWER DOWNLOAD EXAMIANS APP