Power Systems For flat voltage profile system, voltage regulation is any of the above 50% 0% 100% any of the above 50% 0% 100% ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Peak load station. Minimum load station. None of above. Base load station. Peak load station. Minimum load station. None of above. Base load station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Hydro Power Plant Nuclear. Gas turbine. Thermal. Hydro Power Plant Nuclear. Gas turbine. Thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power and the transmission line is compensated with a series capacitance of 0.5 Pu. Find the load angle with series capacitance compensation ? 29° 14.5° 10.5° 35.5° 29° 14.5° 10.5° 35.5° ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 2.044 × 106 kWh. 5 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 2.044 × 106 kWh. 5 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Communications lines are treated as short transmission lines long transmission lines any of the above medium transmission lines short transmission lines long transmission lines any of the above medium transmission lines ANSWER DOWNLOAD EXAMIANS APP